SparX
It's ALIVE
|
|
|
#2637
|
|
Yes and no.
We had a huge discrepancy with what is in the system vs what was physically there, but we also needed to account for half the material being packaged up already. I understood that, but bossman wasn't quite understanding what I was saying and starting getting a bit angry and loud about him not understanding .-. In the end it was less then 200 grams off and not 1000 something because of me accounting for said prepackaged material.
Plus the state traceability system is supposed to be transferred to a new provider, forcing us into a blackout with no inventory doing at (transfers, converting, desctruction, creation, ect ect) But it is no longer scheduled for the 29-31, but the blackout is still looming on us with a "Soon as possible" date.
Essentially we can do no business and only plant care or packaging for the blackout days, if there is anything to be done at all. .-. I had to go to a 4 hour seminar about it last week. Freakin STUPID.
|
|
Posted 10-23-2017, 08:23 PM
|
|
|